1300 648 968
Enviromental Dam Wall Replacement and Upgrade
Design and Construct a new Dam Wall and associated upgrades. Included a compacted Earth wall including RC spillway and Gabion protection.
Enviromental Monitoring and Sample requirements.
Removal of existing Spillway and Dam Wall. Dam Engineering to DERM requirement. Excavation, profiling and topping Dam Structure.
Our Gallery
Masterbuild is an experienced company with a vast knowledge in multi-discipline construction specialising in Building and SMP (Structural, Mechanical, Piping) Design, Construction Planning and Documentation. We use the latest software for our key disciplines along with robust systems for planning, design and drafting. Our work covers the industrial buildings, process plants and the design of specialist mechanical equipment.
Contact Us Today
Add your details. We'll contact you promptly.
Alternatively, call us on
1300 648 968